Job 02

Work consisted of: Earthwork, geotechnical, fire suppression system, storm drainage, underground electrical, sewer piping, irrigation piping, storm water detention basins, storm water emergency overflow structures, aggregate base, asphalt paving, curb, gutter and sidewalks.