SBA logo 8(A) Joint Venture - Click Here

The SWS Mission

To place our company in a position where our strong managerial skills, excellent quality of work and everlasting relationships with our clients, can improve the quality of life for the general public and at the same time leave a legacy for our families.

Our commitment to customer service and developing long-term relationships has earned us an exceptional reputation we work hard to protect. We pride ourselves on our safety procedures while providing quality services, simultaneously completing our projects on time and within budget.

Our Capabilities

We specialize in turning the vision of our clients into reality that can be shared and enjoyed amongst
thousands of people who utilize these improvements.

Other Heavy and Civil Engineering
Water and Sewer Line and Related Structures
Industrial Building Construction
Site Preparation Contractors
(Primary) Highway, Street, and Bridge Construction
Sewage Treatment Facilities
Poured Concrete Foundation Structure

15 Yrs

Quality Craftmanship

127 +

Current & Completed Projects

25 +

NAICS Codes

70 + Yrs

Combined Construction Experience

Most Recent Projects

Canal Construction Repair and Replacement IDIQ

The Interior Region 8 Lower Colorado Basin encompasses the states of Arizona, Nevada and California, the programs and projects cover over 202,000 square miles of the West with a focus of the lower 688 river miles of the Colorado River system. In a typical year, Reclamation facilities in the LC Basin deliver 7.5 million acre-feet (maf) of...

Installation of Underground Propane Piping & Storage

The scope of work included removing all of the individual above-ground 500-gallon LPG tanks that currently serve the buildings throughout the park headquarters, and installing two (2) underground 6500-gallon LPG tanks at a central tank-farm site. The propane gas was distributed from the tank-farm throughout the park to all buildings needing gas service via...

Irrigation Canal Replacement at Dennis Underwood Conservation Area

Site Work Solutions all personnel, equipment, tools, materials and supervision to remove old concrete canal lining material, gates and field ports and disposed offsite. Site Work Solutions prepared the canal pad for canal lining and applied a pre-emergent herbicide. Replaced canal gates, field turnout ports, relined the irrigation canal and conducted final grading of...

Bechelli Lane Water and Sewer Project

Scope of work for this project included materials, labor, tools, and equipment to do all the work required for water, sanitary sewer, and storm drain improvements in Bechelli Lane and adjacent streets. Water improvements included replacement of approximately 14,000 linear feet water mains with new polyvinyl chloride (PVC) and ductile iron pipe ranging from...

Fort Carson Drainage Improvements-Task Order 01

Building 1219: PHASE 1 – Secured site by placing approximately 60 LF of temporary fencing. Because this site is not within a travelled road area, no traffic control is anticipated other than fencing to protect the work area. PHASE 2 – Utilizing a concrete breaker mounted to Site Work Solutions Backhoe, our in-house crew...

We are Small Disadvantaged Business & HUBZone Certified

Being a Native American owned General Engineering / Building construction firm, our great pride in safety programs and procedures, and utmost concern for the safety and well-being of our employees and contractors, has been and continues to be rewarded day in and day out as we remain an accident free company.

SBA white logo

SBA Contractor
of the Year 2015

Client Testimonials

“It is my pleasure to recommend Site Work Solutions to the other public agencies and organizations who seek a conscientious, capable and cooperative contractor for any upcoming construction project. Our experience with Site Work Solutions on the Clear Creek Access Improvements Project was outstanding.”

US Dept of the Interior: Bureau of Land Management
Francis Berg
Assistant Field Manager
US Dept of the Interior: Bureau of Land Management

“I feel confident recommending Site Work Solutions, Inc. for any and all General Engineering Contracting Services. They are not only thorough, but also easy to work with, and always willing to take the time to discuss any concerns and respond to any questions.”

City Of Anderson
Jeff Kiser
Asst. City Manager
City of Anderson

“I am writing this letter to thank your company, Site Work Solutions, Inc. for a job well done on the City of Redding’s Benton Airpark Drainage and Site Improvement Project from June 24, 2007, to July 9, 2007, as well as our Sacramento River Trail Extension Project from June 20, 2007, to February 8, 2008. During these construction projects, your company showed diligence and dedication to finish the projects on time and within our budgeted amounts.

The City Of Redding would not hesitate to refer Site Work Solutions, Inc., to other organizations who are also in need of quality services from a contractor.”

City Of Redding
Don Chilton, P.E.
Project Coordinator
City Of Redding
View Full Letter »

“SWS (Site Work Solutions) was a great firm to work with. The quality of work was outstanding. All their work was done in a safe manner. They were able to meet the needs of the contract and offer better methods for getting their work done.”

PWR-PORE Point Reyes National Seashore
Alanna R. Gardner
Contracting Officer
PWR-PORE Point Reyes National Seashore

Our Clients

We have been providing comprehensive General Engineering and Building Contracting with 5 star results to our clients, catering excellent workmanship & managerial skills.