Job 148

The scope of work on this project was to remove, properly dispose of and replace one 1500 gallon gasoline tank and one 1500 gallon diesel tank. The replacement tanks consisted of new Envirosafe Flameshield 4,000 gallon small fleet split tanks.  Furthermore, Site Work Solutions installed a catwalk platform, an “Erect-A-Step” structure made by SafeRack Work Platforms. Bollards, slide gates and an electronic leak detection system with electronic automatic tank gauging and level alarms were also installed.