Job 148
The scope of work for this project included the removal, proper disposal, and replacement of one (1) 1,500-gallon gasoline storage tank and one (1) 1,500-gallon diesel storage tank.
Site Work Solutions furnished and installed new Envirosafe Flameshield 4,000-gallon small-fleet split fuel tanks to replace the existing storage system. The project also included the installation of a catwalk platform and an Erect-A-Step access structure manufactured by SafeRack Work Platforms to provide safe and efficient access to the tank system.
Additional site improvements included the installation of protective bollards and slide gates, as well as an electronic leak detection system equipped with automatic tank gauging and level alarms. These upgrades enhanced fuel storage safety, monitoring capabilities, and operational reliability while providing improved access and protection for the new tank installation.