Job 144
The scope of work for this project included critical water infrastructure improvements at two locations within historic Lassen Volcanic National Park: the KYVC and Drakesbad sites.
At the KYVC site, Site Work Solutions demolished and removed the existing damaged steel water storage tank and replaced it with a new storage system. Associated piping, telemetry, controls, and related equipment were also replaced or upgraded to support reliable system operation and monitoring.
At the Drakesbad site, Site Work Solutions removed and replaced the existing water treatment building and associated water treatment and disinfection equipment. The improvements were designed to modernize the facility, improve treatment performance, and provide a reliable water system for ongoing park operations.
The project incorporated comprehensive demolition, installation, and system integration while maintaining a strong focus on protecting the surrounding National Park environment and supporting the long-term reliability of critical water infrastructure.
