Job 104

This project consisted of providing all labor, equipment, and materials to demolish approximately 70 linear feet of curb and gutter in the southeast corner of the Building 21 parking lot and replace it with 80 linear feet of curb and gutter sloped to drain to the south. In addition, demolish and re-pave with asphalt approximately 1700 square yards of asphalt and concrete parking lot and paint seventeen parking stalls and one handicapped marking in the Building 21 parking lot. Furthermore we demolished and re-paved with asphalt, approximately 2370 square yards of asphalt in the Building 2 parking lots and repaint 48 parking stalls and demolished and repaved with asphalt approximately 1412 square yards of asphalt in the Building 24 parking lot and repaint 20 stalls and one handicapped parking symbol.