Job 45

Project consists of replacing an existing gate hoist trolley beam runner that has become damaged. The cause of the original beams damage is not fully understood. From reviewing existing records and visual inspection of the original hoist trolley (original has been replaced due to damage). SWS is to provide engineering analysis of existing beam and determine if beam is undersized. Upon results, provide engineering drawings indicating correct size beam replacement, install new beam and provide non destructive testing (NDT).