Job 46
Project consisted of repairing of damaged crane stops and parapet wall atop Grand Coulee Third Power Plant in Grand Coulee, Washington. The crane had been allowed to free wheel along its rail system during a wind storm and traveled to a point of impact to the crane stops and parapet wall. Fortunately the crane did to topple over the dam, but it did a substantial amount of damage to crane stops and parapet wall.
Our work consisted of: Removing existing damaged crane stops and portions of parapet wall, furnishing and placing cast-in-place concrete to make repairs to existing reinforced concrete parapet wall and to construct new crane stops, furnishing and installing miscellaneous metalwork, furnishing and applying coating, removing, storing, and reinstalling existing HVAC equipment, removing, storing, and reinstalling existing electrical conduit.