Job 164

Site Work Solutions completed comprehensive landscape and irrigation improvements, including site preparation, grading, irrigation installation, landscape rock placement, and new plantings.

Existing rock, sod, and soil were removed as required to prepare the site for installation of geotextile fabric and new landscape rock. The existing sprinkler system was abandoned in place or removed where necessary to accommodate the improvements.

New PVC irrigation lateral lines were installed from the existing valve box located on the east side of the building to serve the new plantings. New drip irrigation lines were then connected to the PVC lateral lines and extended to individual plants. A new Hunter irrigation controller was installed inside the building in the existing controller location and connected to the existing wiring.

Site grading included the construction and shaping of two (2) to three (3) landscape berms using existing on-site material. Geotextile fabric was installed throughout designated areas prior to placement of new landscape rock. Approximately 1-inch to 3-inch rock was installed at a depth of 3 to 4 inches.

To contain the new landscape rock, approximately 60 linear feet of 6-inch x 6-inch lumber edging was installed along the north end of the project. Approximately thirty (30) 1-gallon lavender plants were also installed, completing the landscape improvements.