SWS logo
Client Login
  • Home
  • About Us
    • About Us Main
    • Our Team
  • Capabilities
  • Projects
  • Testimonials
  • Careers
    • Join The Team
    • Current Openings
  • Contact Us

Replace Water Distribution System at Manzanita Lake Campground

Job 145

The scope of work on this project consisted of removing and replacing existing underground water distribution lines and appurtenances throughout the Manzanita Lake Campground located in historic Lassen National Park. In addition, Drinking fountains and fire hydrants were installed.

Click to Expand
Click to Expand
Click to Expand
Click to Expand
Click to Expand
Click to Expand
Click to Expand
Click to Expand
Click to Expand

Specifications

Date Completed: 2024-10-04
City: Mineral
State: ca
Work Type/s: Construction
PSC Code/s: (Z1NE) Maintenance of Water Supply Facilities
Govt Type: National Park Service
Award Amount: $1,037,478
Contracting Set Aside: HubZone
NAICS Code/s: [221122] Electric Power Distribution[221310] Water Supply and Irrigation Systems[237110] Water and Sewer Line and Related Structures[238910] Site Preparation Contractors
Return to Projects

We are committed to great customer service and long-lasting relationships.

Contact Us
SWS footer logo
  • Home
  • About Us
    • About Us Main
    • Our Team
  • Capabilities
  • Projects
  • Testimonials
  • Careers
    • Join The Team
    • Current Openings
  • Contact Us
Postal Address
PO Box 492247
Redding, CA 96049
Corporate Office
2437 Radio Lane
Redding, CA 96001
Phone: (530) 222-2229
Fax: (530) 222-3337
Links
  • Subcontractor Prequalification Form
  • Client Login
  • Admin/Client Logout
Native American Owned U.S. Small Business, SBA HUBZone
Certified, U.S. Department of Transportation (DBE), State of California
Contractor Lic 874552- (A,B & Haz), State of Nevada Contractor Lic 0082352 A General Engineering
  1. Facebook
  2. LinkedIn
© Copyright 2021. Site Work Solutions. All Rights Reserved.
Construction Website Design by Thomas Digital.