Job 138
This project consisted of replacing the water supply main and access road at Drakesbad Guest Ranch. Site Work Solutions installed a new 6″ HDPE water supply main and reconstruction of the primary access road from the guest ranch to the water storage tank. The new water main is located along the rehabilitated road. The road was modified to improve drainage and restore the natural hydrology of the area.