Job 108
This project included three separate project locations. Public Works maintenance facilities repairs that included installation of two small water quality detention ponds and rehabilitation of the roadside ditch along Tammy Lane. McCabe Meadows detention pond retrofit work included minor grading of the pond bottom to allow flow towards the trickle channel. Installation of concrete trickle channel and concrete sediment forebay and retrofit of the existing concrete outlet structure to install a permanent micro pool. Parkglenn trickle channel work included removal and replacement of the existing concrete trickle channel and replacement of one concrete flared end section.