Job 153

The scope of work for this project included the demolition and replacement of existing gates, operators, structural braces, and associated conduit systems.

Site Work Solutions self-performed the installation of new gates and operators, along with excavation and grading required to accommodate the new conduit infrastructure. New concrete gate pads were formed and poured to provide stable foundations for the upgraded gate systems.

The project also included the installation of all new conduits, electrical conductors, and safety controls necessary for complete and reliable gate operation. Upon completion, the new systems were integrated and tested to verify proper functionality and safe operation.

Specifications

Date Completed: 2025-03-26
City: Copperopolis
State: ca
Work Type/s:
PSC Code/s: --
Govt Type:
Award Amount: $202,389
Contracting Set Aside: