Job 113
The scope of work for the project included concrete spall repair on 21 bridges in the Yuma Arizona area. Site Work Soltuions repaired damaged buttresses that had been damaged due to corrosion and vehicular damage. The concrete surfaces were prepared with epoxy concrete patching materials. The twenty one bridges required saw cutting, chipping and removal of concrete as required on the bridge deck, wingwalls. Site Work Solutions sandblasted, cleaned, coated rebar and placed epoxy concrete patching materials on the bridge decks and wingwalls of all twenty one bridges.