Job 129 (TO 01)

Site Work Solutions all personnel, equipment, tools, materials and supervision to remove old concrete canal lining material, gates and field ports and disposed offsite. Site Work Solutions prepared the canal pad for canal lining and applied a pre-emergent herbicide. Replaced canal gates, field turnout ports, relined the irrigation canal and conducted final grading of the canal access road.

Specifications

Date Completed: 2021-02-26
City: Palo Verde
State: ca
Work Type/s:
PSC Code/s: --
Govt Type:
Award Amount: $878,398
Contracting Set Aside: