Job 4
Work consisted of developing a route of travel for pedestrians and bicycle traffic between a residential and business district. Our scope; Provide all labor, materials and equipment and materials for the following; rough and finish grading, multi-plate arch culvert, concrete -headwalls/wing walls, sidewalks, curbs/gutters, street signals, ADA path of travel, underground utilities, landscaping, rough/finish carpentry, base rock, asphalt pavement, riprap, storm water runoff compliance, earth ditches and culverts, subsurface drainage features, erosion control, installation of temporary and permanent traffic control signage, coordination with Army Corp of Engineers 404 permitting on live stream channel crossing and pollution control.
AMERICAN PUBLIC WORKS PROJECT OF THE YEAR 2011