Job 82

Project consisted of removing and disposing one 12’ x 12’ metal building and all building contents and debris including asbestos containing material (ACM).  The Asbestos containing material consisted of black mastic around the HVAC vents, black base cove and associated glue in the interior of the building, black joint sealant in the roof joints, gray exterior HVAC backing, black seam sealant between the concrete slab and the metal building (visible around the exterior of the building), and brown penetration sealant around the exterior penetrations.

Specifications

Date Completed: 2016-03-23
City: Exira
State: ia
Work Type/s:
PSC Code/s:
Govt Type:
Award Amount: $24,309
Contracting Set Aside: