Job 154
The scope of work for this project included the construction of approximately 5,740 linear feet of new 12-inch-diameter water transmission pipeline and associated system improvements. Work included the installation of pipe, fittings, thrust blocks, air vacuum/release valves, a water metering station, blow-off assembly, and tie-ins to existing water transmission lines.
The project also included construction of the Lower Elk Springs bypass, consisting of approximately 50 linear feet of 16-inch-diameter water transmission pipe, along with a gate valve, air vacuum/release valve, fittings, associated appurtenances, yard piping, and connections to the existing water system.
Additional work included associated site improvements, demolition and removal of approximately 10-inch-diameter existing transmission piping, and other related construction activities necessary to complete and integrate the upgraded water transmission system.
Site Work Solutions delivered the project with a focus on maintaining system functionality, improving transmission capacity and reliability, and seamlessly integrating the new infrastructure with the existing water system.