Job 160
The scope of work for this project included a comprehensive site investigation, development of design plans and specifications, environmental permitting, and construction services for the replacement of the North Flume, adjacent abutments, spillway connection to Logan Creek, and associated earthwork.
Site Work Solutions designed and installed a replacement flume with a conveyance capacity equal to that of the existing system, ensuring continued hydraulic performance and operational functionality. The project also included the installation of OSHA-compliant, slip-resistant, and corrosion-resistant walkway surfaces, along with removable handrails to provide safe access for maintenance and operations.
To maintain the functionality of the flume system, Site Work Solutions designed and installed new stoplog slots to accommodate operational requirements. Additional site improvements included erosion and sediment control measures, as well as revegetation and stabilization of all disturbed areas to restore the site and minimize long-term environmental impacts.
Site Work Solutions provided the project from initial investigation and design through permitting and construction, delivering a complete and functional flume replacement and associated site improvements.