Job 160
The scope of work on this project included but not limited to a complete site investigation, preparation of design plans and specifications, environmental permitting and construction services for the replacement of the North Flume, adjacent abutments, spillway connection to Logan Creek, and surrounding earthwork. Site Work Solutions designed and installed a replacement flume with a conveyance capacity that met that of the existing flume. In addition, to OSHA compliant slip-resistant and corrosion-resistant, walkway surfaces and removable handrails were installed. Site Work Solutions designed and also installed stoplog slots to meet the functionality of the flume. Furthermore, erosion and sediment control measures such as vegetation and stabilization of all disturbed areas was implemented.