Job 101
The project consisted of replacing existing 6-inch and 12-inch VCP and ABS sewer pipe with new 8-inch and 12-inch PVC Pipe. In addition, existing sanitary sewer laterals were replaced between the new main and right-of-way where cleanouts were installed. A new 6-foot and two 4-foot manholes were constructed, two existing 4-ft manholes were replaced and the remaining manholes were rehabilitated. Some minor storm drain modifications were completed.