Job 120
This project involved the realignment of two existing 6-inch siphons installed under Churn Creek. The work included installation of approximately 1,040 linear feet of 8-inch PVC sewer line, installation of two new manholes, replacement of one existing manhole, and rehabilitation of two manholes. In addition, three manholes were abandoned along with the two existing sewer siphons. Lastly, the access road was realigned and reconstructed over a portion of the new sewer main.