Job 103

The project consisted of removal and disposal of all soil containing contaminates at concentrations exceeding hazardous waste levels within the aggregate processing structure bins. Removal and disposal of all trash and or debris within the aggregate processing structure bins. Demolition of reinforced concrete aggregate processing structure. Removal and disposal of demolished reinforced concrete aggregate processing structure. Re-grading the site to match adjacent contours. Installation of Best Management Practices (BMPs) to prevent erosion. Site testing below the aggregate processing structure was conducted to confirm the removal of soils with contaminate concentrations above hazardous waste levels. Demolition of the existing concrete structure was completed after a thorough investigation as to the level of contamination. An extensive site remediation was conducted to ensure that all hazardous waste was tested and properly removed.